Installation completed by MPG
Stairlift across 2.5 floors in Fouhren
- Location
- Fouhren
- Date
- July 2026
- Installation time
- 8 hours

A stairlift across two and a half floors in Fouhren
MPG installed an Otolift Modul'Air Smart across two and a half floors in Fouhren in July 2026. The rail had to connect several flights while preserving as much space as possible in the entrance. A special hybrid section was therefore incorporated in the middle of the route to fit the building precisely. The installation took eight hours.
A similar staircase at home?
An MPG adviser visits you free of charge, measures your staircase and gives you a detailed, no-obligation quote.










