Installation completed by MPG
Otolift Smart rail extension in Kirchberg
- Location
- Luxembourg-Kirchberg
- Date
- November 2026
- Installation time
- 3 hours

Extending an Otolift Smart rail in Kirchberg
In November 2026, MPG extended the rail of an Otolift Modul'Air Smart stairlift we had previously installed in a home in Luxembourg-Kirchberg. The new made-to-measure section runs around the existing handrail at the foot of the stairs, so the handrail did not need to be modified. The supports were bonded in place, without drilling into or damaging the steps. The whole job took three hours.
A similar staircase at home?
An MPG adviser visits you free of charge, measures your staircase and gives you a detailed, no-obligation quote.








