Installation completed by MPG
Curved stairlift in Keispelt
- Location
- Keispelt
- Date
- October 2026
- Installation time
- 6 hours

Keeping the door with a small cut-out in Keispelt
In October 2026, MPG installed an Otolift Modul'Air Smart on a curved staircase in a home in Keispelt. At the top, the rail had to pass next to a door. A small cut-out in the door was enough: it did not need to be replaced or removed. The rail supports were bonded, without drilling into or damaging the tiles. The complete installation took six hours.
A similar staircase at home?
An MPG adviser visits you free of charge, measures your staircase and gives you a detailed, no-obligation quote.








