Installation completed by MPG
Stairlift on marble stairs in Olingen
- Location
- Olingen
- Date
- October 2026
- Installation time
- 5 hours

A stairlift on marble without drilling in Olingen
In October 2026, MPG installed an Otolift Modul'Air Smart in a home in Olingen. The marble staircase has several turns along the balustrade, and the made-to-measure rail follows each of them. To protect the marble, all supports were bonded in place, without drilling into the steps. The complete installation took five hours.
A similar staircase at home?
An MPG adviser visits you free of charge, measures your staircase and gives you a detailed, no-obligation quote.








